Backlog
Under consideration
No Backlog issues
Next up
Committed and queued
No Next up issues
Done
12Recently shipped
Configurable Field Selection for Data Downloads
Allow users to select specific fields/columns when downloading data to customize the output. This provides flexibility and reduces unnecessary data transfer.
Generate Task Reports
Increased Lists size Sync
Implement batch processing to handle large task volumes reliably Maximum capacity increased to 5000 tasks per sync
Time Entries Export
TIME ENTRIES EXPORT Export time tracked data at workspace, space, folder, or list level Filter by date range and billable status Automatic timezone handling based on user settings Formatted duration display (e.g., "2h 30m")
Being Able to Sync Views
Choose which custom fields
Would be great if I could just which custom fields to include instead of all of them
Tasks with no subtasks should be considered parent tasks
When I export to sheets, Column C shows parent tasks, and column D shows Sub tasks of those groups - but then parent tasks that dont have subtasks populate in column D instead of Column C which logically doesn’t make sense - is it possible to adjust this?